The Original Copper Repiping Specialists®
Commercial and Residential
Installation Procedures


A proper installation is the single most important step to assure a safe, reliable and efficient system. Installation procedures for commercial/residential apartment units, individually owned condominium associations, and single family residential projects are defined in our detailed proposal presented with the costing and customized to the individual building and project requirements.

#1 Site Inspection
A Site Inspection is critical to a successful construction process. Our standard project costing includes installation of all new hot and cold domestic water piping originating at the new service entrance and replacing the main distribution system and branch lines to all existing finished fixtures. Unless specifically included in our proposal and contract, drain replacement and the fixtures themselves such as faucets, toilets, valves, water heaters, etc. are not included.

#2 System Layout
Your materials will be ordered and sized based on UPC code.
Standard Project Specifications for Materials is based upon owner requirements and industry standards. Detail descriptions provided with free estimate.

#3 Site Preparation
Prior to Construction, owner/tenant will be given a complete set of instructions for preparation.
#4 Installation
Professionally trained and managed installation crews are directly responsible for the safety, reliability and efficiency of your new system. Standard Project Specifications for Workmanship is based upon owner requirements and industry standards.
#5 System Performance Test
The new installed system is tested for proper operation. Final adjustments are made to assure a safe and efficient installation.
#6 Inspection
Upon receipt of your contract, we will secure necessary plumbing permits with your city or jurisdiction. Unless otherwise specified, inspections are set for the following day after your system is installed.
#7 Wall Repair
After city inspection and approval, we will begin the wall repair and final cleanup for your project. Standard Project Specifications for Wall Repair is based upon owner requirements and industry standards. Detail descriptions provided with free estimate.
#8 Job Completion
After final wall repair and cleanup, we will walk you through your job and do a final inspection to ensure that all work is completed and in accordance with good and workmanlike construction.

Copyrights.1999. All rights reserved.Cal-Coast Repiping Inc.
Company Info
Company Profile
Affiliations
Referrals
Contact us

Why Repiping
What is Repiping
Why Repipe
with Copper
Why Choose
Cal-Coast Repiping

Services
Performance Guarantees
Installation Procedures
Free Estimate
 

Email Us Home Page